In 1987, the Northeast Petroleum Management Bureau petrochemical materials company was founded.
In 1996, the petrochemical materials company changed its name to Shenyang Tianbao (Group) materials and Equipment Co., ltd..
In 2000, CNPC Tianbao Group was founded.
In 2001, Shenyang Petroleum Materials Recycling Co., Ltd. was founded.
In 2001, PetroChina Tianbao Group's main investment, China Petroleum Pipeline Bureau shares, restructuring the original Northeast Oil Management Bureau affiliated enterprises, Tieling machinery factory, renamed Tieling oil machinery equipment manufacturing co..
In 2002, CNPC Tianbao Group and China Petroleum Pipeline Bureau and Shanghai Minhang District Pujiang town Asset Management Co., Ltd. jointly established Shanghai PetroChina Tianbao Steel Tube Co., ltd..
In 2003, PetroChina Shanghai Tianbao Steel Pipe Co., Ltd. was arranged for Shanghai city to introduce seventh investment. It was listed as a major project in 03 and 04 years by the Shanghai Municipal Economic Commission, and enjoys a series of preferential policies for large enterprises in Shanghai and shanghai.
In 2003, the new Shanghai International Terminal Co., Ltd. was established, with an annual throughput of 3 million tons.
In 2003, the establishment of Liaoning East oil group housing development co..
In 2003, the establishment of Beijing Tianbao materials and Equipment Co., ltd..
2004, the implementation of capital operations, with a total investment of 650 million yuan, linkage, reorganization of the original large state-owned enterprises, Anshan cold bend steel mill, Liaoning North foundry, Anshan work. Anshan Tianbao Steel Tube Co., Ltd., PetroChina Anshan Tianbao Foundry Co., Ltd. and Anshan Qiangli Heavy Industry Co., Ltd. were established respectively.
In 2004, Shanghai steel tube company built the first ERW diameter 610mm steel pipe production line in china.
In 2004, Anshan strong heavy industry Co., Ltd. developed and successfully developed the TJ10-50 wheel - type through - well machine at the latest technological level in china.
In 2005, Anshan strong heavy industry Co., Ltd., the new two generation red flag TY165 bulldozer, came on the market.
In 2005, a series of mine vibrating screen and EBZ160 heavy tunnel boring machine were successfully manufactured in Anshan heavy heavy industry Co., ltd..
In May 2005, CNPC Shanghai Tianbao Steel Tube Co., Ltd. was approved by the General Administration of quality supervision, inspection and quarantine and obtained the production license of industrial products in china.
In June 2005, Shanghai Tianbao Tianbao Steel Pipe Co., Ltd. was put into production.
In July 2005, X42 grade for 630 * 20 steel successful trial production, the first branch of the maximum diameter of the maximum wall thickness of the welded steel pipe was born.
In August 2005, Shanghai Tianbao Tianbao Steel Pipe Co., Ltd. was examined and approved by China Chemical Machinery Power Association to obtain the certificate of chemical corrosion protection construction.
In August 2005, the Shenyang oil and gas international Hotel Plaza Limited was completed.
In September 2005, the successful production of L415 steel grade ERW steel pipe in Shanghai PetroChina Tianbao Steel Tube Co., Ltd. was first entered into CNOOC market.
In September 2005, CNPC Anshan Tianbao Casting Co., Ltd. passed the railway rolling stock truck to K2 bolster bolster production quality certification, and became one of the 15 enterprises in the Ministry of Railways external cooperation.
In 2005 became a supplier of sinopec.
Became an oil supplier in 2005.
In 2005 to become CNOOC supplier.
In February 2006, 100 thousand tons of petroleum casing pipe project was completed and put into operation in Anshan PetroChina Tianbao Steel Tube Co., ltd..
In March 2006, CNPC Shenyang Tianbao international Hotel Plaza Limited officially operated.
In March 2006, Anshan heavy power heavy industry Co. Ltd., EBZ135 roadheader and ZMY120 coal loader were out of stock.
In May 2006, Shanghai ocean Tianbao Steel Tube Co., Ltd. X65 ocean pipe trial production success.
In June 2006, Shanghai PetroChina Tianbao Steel Pipe Co., Ltd. bushing production line test.
In September 26, 2006, Zhang Wenyue, governor of Liaoning Province, visited Anshan PetroChina Tianbao Steel Tube Co., ltd..
In 2006, the establishment of Asia's first Singapore Investment Co., Ltd., for enterprises to invest in the field of international investment has taken a solid first step.
In March 2007, CNPC Tianbao Group shares investment chairman Liu Xinfa of the Shenyang commercial bank was renamed Shengjing bank, and served as the vice chairman.
In April 2007, the product of "5-1/2 N80" steel bushing produced by Anshan PetroChina Tianbao Steel Tube Co., Ltd. was successfully tested in Liaohe oilfield.
In October 2007, PetroChina Anshan Tianbao Steel Pipe Co., Ltd. products entered the international market for the first time, and the oil pipe exported to the United states.
In December 2007, Anshan Tianbao Steel Products Co. Ltd. 2-3/8 N80 steel, plus two unthickened thick oil products in the test wells in Liaohe Oilfield in Su ten project next success.
In 2007, Anshan PetroChina Tianbao Steel Tube Co., Ltd. independently developed special casing buckle, oil pipe partial ladder buckle.
In 2008, PetroChina Anshan Tianbao Foundry Co., Ltd. successfully developed 1.5MW wind turbine, planetary frame, cast steel parts, and mass production, with an annual output of more than 500.
In 2008, the successful joint venture Tianbao Group and the German SPG group, was established two joint ventures: Tianbao Steiner (Shenyang) Petroleum Gas Engineering Co. Ltd., Tianbao Steiner (Tieling) oil and gas equipment Co., ltd..
In 2008, CNPC Tianbao Group and Brazil BRASTUBE joint venture, set up Shanghai Tianbao Ba Sheng Steel Pipe Co. ltd..
In August 25, 2009, following the Baosteel Group, second UOE submerged arc welded steel pipe production lines were put into operation in Shanghai steel tube company.
September 2009, the acquisition of Grand Dynasty Hotel Beijing, changed its name to Beijing new hotel.
In September 2009, the 5-1/2 grade J55 steel bushing of Anshan PetroChina Tianbao Steel Tube Co., Ltd. was successfully tested in Daqing oilfield.
In December 2009, CNPC Tianbao Group was incorporated into China Petroleum internal enterprises, and enjoy the same treatment of internal enterprises.
In January 13, 2010, CNPC Tianbao Group in the "China Petroleum 2010 special oil pipe online invitation to bid" in the comprehensive ranking of third, the overall ranking of the first.
In April 30, 2010, the 340 production line of Anshan Tianbao Tianbao Steel Pipe Co., Ltd. was completed and put into production.
June 2010 6